Project: St Aloysius College

St Aloysius College (Kirribilli, NSW)

Client: Advanced Steel Design

Advanced Steel Design appointed Galserv to hot-dip galvanise 11 tonnes of structural steel as part of a project at St Aloysius College, Kirribilli NSW.

The project included single and double-dip steel sections, completed and delivered within two weeks utilising our in-house delivery service.

  • Completion: February 2022
  • 11 tonnes of steel galvanised
  • Service: Galvanising, Sandblasting, Express Service Loading and Delivery

Our Semi and Rigid truck teams were in position at 7:00 am on a Saturday to meet the specific unload window, minimising road closure times and enabling efficient use of cranes. Our flexibility and on-time delivery assisted crews who were able to install all galvanised steel within 1 day.

 

2560

Project: Fairvale High School

Advanced Steel Design appointed Galserv to hot-dip galvanise 11 tonnes of structural steel as part...

1333

Project: Pyes Creek Swing Bridge

Advanced Steel Design appointed Galserv to hot-dip galvanise 11 tonnes of structural steel as part...

1200

Project: Eagle Shelter

Advanced Steel Design appointed Galserv to hot-dip galvanise 11 tonnes of structural steel as part...